Kuala Lumpur–Singapore High Speed Rail
The Kuala Lumpur - Singapore High Speed Rail (HSR) project was announced by the Malaysian Prime Minister Najib in September 2010 and is proposed to connect Kuala Lumpur and Johor Bahru with Singapore.[1] On February 19, 2013, Singapore and Malaysia have officially agreed to build a high-speed rail link between Kuala Lumpur and Singapore by 2020 at a meeting between Singapore’s Prime Minister Lee Hsien Loong and Malaysia’s Prime Minister Najib Razak in Singapore. [2]
Plan details[edit]
The KL - Singapore section will be about 400 km and the travel time will be 90 minutes.[9] The construction cost will be MYR 40 billion.[10][9] The project will request the construction of a brand-new line with dedicated tracks, which will allow trains to travel at least 250 km/h.[2] YTL and SPNB will co-ordinate the project for the essential construction within the Malaysia corridor, whereas LTA will be in charge for Singapore corridor.
Stops in Malaysia[edit]
Malaysia's Land Public Transport Commission chairman, Syed Hamid Albar, announced the stops in Malaysia on October 22 2014. [11]
Stops in Singapore[edit]
The Singapore government is still considering three options to site the Singapore station. [12]
高速鐵路的停靠站點會影響房價!!!
Singapore and Malaysia have announced that the high speed rail proposal will be finalized by end of 2014 with a targeted completion date at 2020
馬來西亞與新加坡高速鐵路完工日期為2020年